Howdy. I have been trying to import a multi-cam sequence from Premiere Pro CS6. I have been successful in bringing XMLs of regular sequences in. I think the problem is the multi-cam being a nested sequence and the XML doesn't look inside the nested sequence to pull the filenames from the original clips. Does anyone know of a work around for this yet. I have been reading about using the scene detect however it seems to be really slow for importing a 80min long timeline. Is there anyway to commit the multicam edits and have them update to the file names from the original footage.
↧